Facilities and Equipment – 1st Quarter 2024

March

March 18

Removing of Clog and Waste Materials in the Comfort Room at the Back of the Stage

March 6

Repairing of TVNHS Exit Gate

March 6

Repairing of Classroom Chairs

March 5

Repairing of New Building 03 Gate

March 4

Installing Additional Solar Light Focusing on Remulla Building

February

February 24

Installing More Fluorescent Lights at Remulla Building Classrooms

February 24

Installing One Fluorescent Light at the Remulla Building 01

February 24

Replacing One Fluorescent Light at the New Building 07

February 24

Replacing One Fluorescent Light at the New Building 06

February 24

Replacing One Fluorescent Light at the New Building 05

February 24

Replacing One Orbit Fan at the New Building 04

February 24

Replacing One Orbit Fan at the New Building 01

February 21

Replacing Fluorescent Lights at Luis Y. Ferrer Building 05

February 21

Replacing Fluorescent Lights at the Science Laboratory

February 21

Replacing Fluorescent Lights at the Main Building Hallway

February 21

Repairing Electrical Outlet at Main Building 04

February 21

Replacing the Nonfunctional Fan at the Guidance Office

February 20

Repaired Kitchen Sink at Science Room

February 20

Installing Ceiling Fan at New Building 04

February 20

Repairing Ceiling Fan at New Building 02

February 20

Repairing Wall Fan at Remulla Building

February 15

Improving Backdoor Gate at Arroyo 02 Building

February 15

Improving Backdoor Gate at Arroyo 02 Building

February 12

Installing an Internet Router at the New Building

February 12

Installing an Internet Router at TVNHS Library

February 6

Replacing Two Fluorescent Light at the Madrassa Room

February 1

Repair of Gate Valve

January

January 23

4th Batch of Repaired Ceiling Fan for Classroom Use

January 22

Installing New Air Conditioner at SBM Room

January 19

Constructing Three New Lavatory Between Madrassa Room and Teachers’ Faculty Room

January 18

Constructing Two Overhead Water Tank Stand Beside Madrassa Room

January 17

Installed 1pc of 2-Gang Outlet at SBM Room

January 17

3rd Batch of Repaired Ceiling Fans for Classroom Use

January 13

Painting Bookshelves

January 13

Repairing Electrical Wiring

January 11

Replacing Two Defecting Ceiling Fans into Functional Fans at the Madrassa Room

January 10

Repaired Another Set of Two Ceiling Fans for Classroom Use

January 9

Installing Air Conditioner Compartment

January 9

Repaired Two Ceiling Fans for Classroom Use

January 9

Fixing Door Grills in Remulla Building Classroom

January 8

Enhancing Badminton Posts

January 8

Fixing Lavatory, Pipeline, and Faucet

January 4

Cleaning Arroyo Building