March
March 18
Removing of Clog and Waste Materials in the Comfort Room at the Back of the Stage
March 6
Repairing of TVNHS Exit Gate
March 6
Repairing of Classroom Chairs
March 5
Repairing of New Building 03 Gate
March 4
Installing Additional Solar Light Focusing on Remulla Building
February
February 24
Installing More Fluorescent Lights at Remulla Building Classrooms
February 24
Installing One Fluorescent Light at the Remulla Building 01
February 24
Replacing One Fluorescent Light at the New Building 07
February 24
Replacing One Fluorescent Light at the New Building 06
February 24
Replacing One Fluorescent Light at the New Building 05
February 24
Replacing One Orbit Fan at the New Building 04
February 24
Replacing One Orbit Fan at the New Building 01
February 21
Replacing Fluorescent Lights at Luis Y. Ferrer Building 05
February 21
Replacing Fluorescent Lights at the Science Laboratory
February 21
Replacing Fluorescent Lights at the Main Building Hallway
February 21
Repairing Electrical Outlet at Main Building 04
February 21
Replacing the Nonfunctional Fan at the Guidance Office
February 20
Repaired Kitchen Sink at Science Room
February 20
Installing Ceiling Fan at New Building 04
February 20
Repairing Ceiling Fan at New Building 02
February 20
Repairing Wall Fan at Remulla Building
February 15
Improving Backdoor Gate at Arroyo 02 Building
February 15
Improving Backdoor Gate at Arroyo 02 Building
February 12
Installing an Internet Router at the New Building
February 12
Installing an Internet Router at TVNHS Library
February 6
Replacing Two Fluorescent Light at the Madrassa Room
February 1
Repair of Gate Valve
January
January 23
4th Batch of Repaired Ceiling Fan for Classroom Use
January 22
Installing New Air Conditioner at SBM Room
January 19
Constructing Three New Lavatory Between Madrassa Room and Teachers’ Faculty Room
January 18
Constructing Two Overhead Water Tank Stand Beside Madrassa Room
January 17
Installed 1pc of 2-Gang Outlet at SBM Room
January 17
3rd Batch of Repaired Ceiling Fans for Classroom Use
January 13
Painting Bookshelves
January 13
Repairing Electrical Wiring
January 11
Replacing Two Defecting Ceiling Fans into Functional Fans at the Madrassa Room
January 10
Repaired Another Set of Two Ceiling Fans for Classroom Use
January 9
Installing Air Conditioner Compartment
January 9
Repaired Two Ceiling Fans for Classroom Use
January 9
Fixing Door Grills in Remulla Building Classroom
January 8
Enhancing Badminton Posts
January 8
Fixing Lavatory, Pipeline, and Faucet
January 4
Cleaning Arroyo Building
Please follow and like us: