Facilities and Equipment – 2nd Quarter 2024

May

May 23

Replacing Concrete Staircase to Steel Staircase at TVNHS Exit Gate

May 14

Widening Pathway Along TVNHS Covered Court

May 14

Applying Cement on Stair Stringer Down at the TVNHS Covered Court

May 14

Fixing TVNHS Stage Outlet

April

April 19

Installing Fluorescent Light at the Old Science Faculty Room

April 19

Repairing New Building 03 Gate

April 18

Installing Air-Conditioner at the Computer Laboratory

April 11

Installing Tiles on Lavatory

April 4

Installing Light Bulb at Science Laboratory

April 1

Repairing Orbit Fan at Main Building 04