Third Quarter (July-September)

AUGUST

August 30

Installation: Fluorescent Light, CO Building 01

August 22

Installation: Medical Kits, All Rooms (Designated Areas)
Replacement: Convenience Outlet, LYF Building 05
Replacement: 2 pcs CFL Bulbs & Receptacles, Poultry Area

August 21

Installation: 2 Sets of 2-Gang Outlets, Guidance Office

August 20

Painting: Steel Fence, New Building
Repair: Steel Gate, Accounting Office
Replacement: Doorknob, School Canteen

August 19

Posting: Tarpaulins, School Entrance

August 18

Painting: School Fences & Faculty Room Gates

August 14

Installation: 2 Wall Fans, Arroyo Building 02
Installation: Convenience Outlet, Accounting Office

August 11

Installation: PVC Wooden Panel, Audio Visual Room

August 9

Repair: Tables
Installation: Steel Rail, Flagpole Area

August 7

Installation: Steel Bracket, Main Building

August 6

Installation: Tiles, Flagpole Area

August 5

Installation: 3 Sets of Doorknobs, Computer Laboratory
Installation: 1 Unit Window-Type Air Conditioner, Computer Laboratory
Planting: Ornamental Plants, Flagpole Area
Replacement: Doorknob, Guidance Office

August 4

Painting: Wall, Waiting Area & Entrance Gate
Transfer: Bulletin Board, Waiting Area -> Front of Accounting Office

August 2

Painting: Ceiling, Accounting Office
Painting: Steel Fence, ICT Laboratory
Painting: Steel Fence, School Entrance Gate

August 1

Installation: Steel Bracket, Arroyo Building 01-03, Science Laboratory, and Main Building
Repair: PVC Water Line, In Front of CO Building
Repair: Main Gate, CO Building 01

JULY

July 31

Removal: Floor Guide Rail, Audio Visual Room

July 30

Posting: School Facilities & Wellness QR Codes, School Premises
Repair: Faucet, Lavatory Sink
Repair: Doors, CO Building 01
Installation: Tarpaulins, Exit Gate Wall
Repair: Roofing, Accounting Office
Replacement: Fluorescent Light, New Building 06

July 29

Repair: Fluorescent Casing Holder, Arroyo Building 02 & 03
Repair: Entrance Gate Hinge

July 28

Repair: Canals using PVP Pipe, In Front of Science Laboratory
Plant Trimming: In Front of the Principal’s Office
Repair: Fluorescent Light, LYF Building 01

July 21, 2025

Installation of Room Number and Section Signage to Facilitate Efficient Identification by Students, Faculty, and Visitors

July 18, 2025

Pruning of Overgrown Moringa Branches in the Garden for Replanting
Putting Up Earthquake Safety Reminder Tarpaulin: What to Do Before, During, and After an Earthquake

July 16, 2025

Ground Maintenance: Grass Trimming and Cleaning in Front of the Principal’s Office
Maintenance Repainting of the Flagpole Area

July 8, 2025

Repair of a 2-Gang Outlet in the LYF Building, Grade 10 – Artemis
Wiring Installation at the MIGZ Building Designated for SMAW Activities

July 7, 2025

Completed Repair of Doors in the Poultry Area
Cleaned Gutter in the Clinic Area
PVC Extension Installed to Prevent Flooding in the Covered Court

July 4, 2025

Ongoing Cement Work at the Flagpole

July 1, 2025

Fabrication of a Wooden Frame for the Flagpole Concrete Extension