Skip to content
JUNE
June 30, 2025
Replacement of the Doorknob in the Guidance Office
June 24, 2025
Repairing of Tables
Replacement of 1-Gang Switch in the PWD Comfort Room Near the Exit Gate
June 23, 2025
Constructing and Painting of PWD Lane in Front of Canteen, Clinic, and AB03 Building
June 19, 2025
Pull Out and Replacement of Fluorescent Light in New Bldg. NB05, NB06, and NB07
Cleaning and Trimming of Grass Infront of Principals’ Office
Painting of Warning Sign Infront of Library and Canteen
Replacement of 20Watts to 40Watts LED Type of Fluorescent Light in MIGZ Bldg
June 15, 2025
Collecting Garbage and Cleaning of Corridors in Preparation for the Start of Classes
June 13, 2025
Installation of Water Pipeline for the New Washing Area Beside LYF building
Concrete Flooring of Canals Between the New Building and the CO Building
June 10, 2025
Painting of the Steel Gate Frame at the Main Entrance
MAY
May 8, 2025
Installation of a Split-Type Inverter Air Conditioner in the Library
Construction of Ramp Pathways for PWD Students’ Accessibility
May 6, 2025
Cleaning of the Entrance Gate Roof
Replacement of the Side Gutter on the Entrance Gate Roof
May 5, 2025
Mounted the Bracket at a Higher Level in the Audio Room