June
June 26
Repainting of School’s Stage

June 15
Repainting of School’s Stage

May
May 23
Repairing of Wall Décor at SBM Room of School Projects

Trimming of Excess Branches of Trees near at Covered Court

Cleaning and Declogging of Roof Gutter of Covered Court

Installation of Water Pipeline from LYF Connecting to the New Building Pipeline

May 18
Replacing of Defective Doorknob at the Central Office Building Rm. 2

Installation of Old 24″ Television to a New 32″ Television at Arroyo Building Rm. 3

Upgrading of the Concrete Stair in the Covered Court

May 17
Installation of Additional Electrical Outlet for the Newly Installed Air-Condition Unit in the SBM Room

May 15
Installation of Air Conditioning Unit in the SBM Room

May 10
Installation of Additional Wall Fall At new Building Room 04

Installation of Additional Wall Fan Arroyo Building Room 02

Replacing the Old 24″ TV to a New 32″ at Arroyo Building Room 2

Installation of One Air Conditioned Unit in the Guidance Office

May 9
Installation of New Television at New Building Room 05

May 8
Installation of New Television at Main Building Room 02

May 6
Replacing of Busted fluorescent Lamp at TVNHS Science Laboratory

May 2
Repairing of Steel Gate of New Bldg. Room 7 for Safety Purposes

April
April 28
Installation of additional Wall Fan at LYF Bldg. Rm. 04

Cutting and Removing of Existing Trees at Remulla Building

Declogging of Drain Line Pipe in the Comfort Room

April 25
Installation of New Wall Fan at Remulla Building Room 03

Installation of New Wall Fan at New Building

April 24
Installation of Additional Wall Fan at Main Building Room 04

Installation of Additional Wall Fan at Arroyo Bldg. Rm. 01

Installation of Additional Wall Fan in Main Building Room 03

April 10
Repairing of Steel Gate, Right Entrance of COB Rm. 2 for Safety Purposes

Repairing of Steel Gate for Safety Purposes

April 1
Trimming of Narra Tree for Safety Purposes

Please follow and like us: